Phalen
Creek Tunnel
Urban
Waste and Max Action at the junction of the limestone section built
in the 1890's and the concrete section built in the 1930s. The bottom
picture on the "History
Lesson" page shows the mouth of the old segment and the construction
of the section behind them.
|